by manjade » Sun Nov 06, 2022 8:06 am
Hi
Just wondering if it would be possible for the push back due dates value to remember what I put in the time before - as it currently always resets to 1.0 and I prefer to push back a smaller amount, eg 0.5, and so have to change it every time
Thanks
Alastair
Hi
Just wondering if it would be possible for the push back due dates value to remember what I put in the time before - as it currently always resets to 1.0 and I prefer to push back a smaller amount, eg 0.5, and so have to change it every time
Thanks
Alastair